시험덤프
매달, 우리는 1000명 이상의 사람들이 시험 준비를 잘하고 시험을 잘 통과할 수 있도록 도와줍니다.
  / NCS-Core 덤프  / NCS-Core 문제 연습

Nutanix NCS-Core 시험

Nutanix Certified Services Core Infrastructure Professional 온라인 연습

최종 업데이트 시간: 2024년04월26일,191문제.

당신은 온라인 연습 문제를 통해 Nutanix NCS-Core 시험지식에 대해 자신이 어떻게 알고 있는지 파악한 후 시험 참가 신청 여부를 결정할 수 있다.

시험을 100% 합격하고 시험 준비 시간을 35% 절약하기를 바라며 NCS-Core 덤프 (최신 실제 시험 문제)를 사용 선택하여 현재 최신 191개의 시험 문제와 답을 포함하십시오.

 / 5

Question No : 1


A company needs to replicate their VMs to a remote site and must have an RPO of less than 1 hour.
When creating a protection domain, what should an administrator do to meet this requirement?

정답:
Explanation:
Ref: https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v5_10:sto-pd-guidelines-r.html

Question No : 2


An administrator has a 32-node hybrid cluster with CPU, RAM and storage utilization of 80%. A database VM is configured with VM Flash.
What is causing this IO latency?

정답:

Question No : 3


Refer to the exhibit.



An administrator notices a critical alert on the Metro Availability Protection Domain
What is causing this alert?

정답:
Explanation:
Ref: https://www.vvlsystems.com/wp-content/uploads/2016/11/BP-2009_Metro_Availability.pdf

Question No : 4


A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.
When should the consultant verify the make and model to prepare for the cluster deployment?

정답:

Question No : 5


An administrator is deploying an application using Nutanix Volumes. After configuring the volume group and connecting the guest's iSCSI initiator to the volume group, they begin performance testing.
The administrator learns that performance on the virtual disk attached to the iSCSI initiator is far less than that of a virtual disk connected directly to the VM.
Which situation is causing this condition?

정답:

Question No : 6


An administrator is deploying a three-tier application on a Nutanix Enterprise Cloud consisting of web, application, and database VMs. Traffic between the servers must be limited to specific services/ports. There is an application layer firewall VM deployed on one host in the cluster.
In which way should the administrator meet this requirement?

정답:

Question No : 7


During a technical call with a customer, it is identified that this installation will be software only on Dell servers. The out-of-band management interfaces will not be given IP addresses until the consultant is onsite.
Which Foundation method should be used for this type of installation?

정답:

Question No : 8


After installation, network ports are properly configured with the default active-backup bonding.
One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.
What should the consultant enable to resolve this issue?

정답:

Question No : 9


A customer needs a DR solution designed around the following requirements:
• There are 8 ms of latency between Sites A and B
• The administrator needs the shortest RPO/RTO possible
• Application consistent snapshots are required
• Use of NutanixVSS
Which Data Protection Method should be used?

정답:
Explanation:
Ref: https://portal.nutanix.com/page/documents/details?targetId=Prism-Element-Data-Protection-Guide-v5_18:wc-dr-application-consistent-snapshots-wc-r.html

Question No : 10


An administrator receives an error indicating that the CVMs in the cluster are not syncing to any NTP servers.
An investigation of the issue finds:
• The NTP servers are configured in Prism
• The time on all CVMs is the same
• Both the CVMs and AHV hosts are configured for the UTC time zone.
Which two steps can be taken to troubleshoot this issue? (Choose two.)

정답:
Explanation:
Ref: https://portal.nutanix.com/page/documents/kbs/details?targetId=kA032000000bmjeCAA#Review_ntpq

Question No : 11


A customer with a four-node RF2 cluster is adding application VMs to their system. After adding these VMs, the Prism dashboard shows 81% storage utilization.
What is the consequence of running the cluster at 81% storage utilization?

정답:
Explanation: https://next.nutanix.com/how-it-works-22/recommended-maximum-storage-utilization-37234

Question No : 12


An administrator is responsible for the following Nutanix Enterprise Cloud environment:
• A central datacenter with a 20-node cluster with 1.5PB of storage
• Five remote sites each with a 4-node cluster with 200TB storage
The remote sites are connected to the datacenter via 1GB links with an average latency of 6 ms RTT .
What is the minimum RPO the administrator can achieve for this environment?

정답:
Explanation:
Ref: https://support-portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v5_10:wc-protection-domain-wc-c.html

Question No : 13


A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.
Which two configuration changes should the consultant make next? (Choose two.)

정답:

Question No : 14


A VDI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (Bridge0). The administrator needs to verify if nodes are using all network cards associated to Bridge0.
Which two menus should be used to check the current configuration? (Choose two.)

정답:

Question No : 15


A customer is running out of storage in an ESXi cluster. The customer wants to add storage without paying for an additional hypervisor license.
Which option should the consultant recommend to meet the requirement?

정답:

 / 5
Nutanix