시험덤프
매달, 우리는 1000명 이상의 사람들이 시험 준비를 잘하고 시험을 잘 통과할 수 있도록 도와줍니다.
  / H19-134_V1.0-ENU 덤프  / H19-134_V1.0-ENU 문제 연습

Huawei H19-134_V1.0-ENU 시험

HCSP-Presales-Data Center Facility (Power) V1.0 온라인 연습

최종 업데이트 시간: 2025년11월17일

당신은 온라인 연습 문제를 통해 Huawei H19-134_V1.0-ENU 시험지식에 대해 자신이 어떻게 알고 있는지 파악한 후 시험 참가 신청 여부를 결정할 수 있다.

시험을 100% 합격하고 시험 준비 시간을 35% 절약하기를 바라며 H19-134_V1.0-ENU 덤프 (최신 실제 시험 문제)를 사용 선택하여 현재 최신 537개의 시험 문제와 답을 포함하십시오.

 / 4

Question No : 1


Regarding the adjustable battery of the UPS5000-E, when one battery fails, at least () batteries need to be removed. Then, set the corresponding number of batteries on the monitoring panel.

정답:

Question No : 2


The NetEco management system adopts a high-capacity design architecture, supporting massive device access. It supports up to ( ) tens of thousands of measurement points using a single x86 server, while maintaining smooth system operation and CPU utilization not exceeding ().

정답:

Question No : 3


The battery type supported by UPS2000-G is ().

정답:

Question No : 4


The door types in Huawei Fusionmodule2000V3.0 include ().

정답:

Question No : 5


Huawei Technologies Co., Ltd. is a ( ) of the GB50174-2008 standard and a () of the GB50174-2017 standard.

정답:

Question No : 6


What pole circuit breaker is typically selected for the external maintenance bypass of a UPS system?

정답:

Question No : 7


Traditional UPS systems have fixed battery cell counts, resulting in high battery maintenance costs; the failure of a single battery may necessitate replacing the entire battery pack. The UPS5000-A features adjustable battery cell counts. What is the adjustable range?

정답:

Question No : 8


A project requires the management system to connect to one generator set, two smart meters (of the same model), and two precision air conditioners (of the same model) from a third party. How many third-party device access fees should the management system report?

정답:

Question No : 9


When using a single RH5885 server, what is the maximum number of tens of thousands of test points that the NetEco management system can support for centralized management of multiple data centers?

정답:

Question No : 10


When the NetEco management system intervenes in third-party devices surrounding the micro-module, what monitoring hardware is typically used for access?

정답:

Question No : 11


UPS5000-A/E models above 400KVA are available in standard and enhanced versions. The standard version comes standard with a () disconnect switch.

정답:

Question No : 12


Assume a battery specification states a discharge power of [email protected]@15min. If the system requirement is 1400W, then the number of battery packs selected is ().

정답:

Question No : 13


The UPS500-A-400/500K can support a maximum of () parallel operation, and has good scalability.

정답:

Question No : 14


For a UPS5000-E 100kVA, which of the following input switches is most suitable?

정답:

Question No : 15


Which of the following features is a standard feature of the NETCOL8000-C air conditioner?

정답:

 / 4